| Current Major Building Contracts |
BUILDINGS
|
|
||||||||||||||
|
Zhuhai Ocean Hot Spring Resort – Construction Consultancy Contract The resort development project in Zhuhai has a gross construction area of 285.25 hectare m, including an amusement park of 35 hectare m. The phrase I works cover site area of 54.1 hectare m and include the construction of hotel buildings, hot spring centre, conference centre, fisherman’s wharf, recreational centre and executive office.
|
||||||||||||||
![]() |
||||||||||||||
|
|
National Grand Theatre,
(2000-2006) RMB3,000,000,000 (estimated)
The Company
is undertaking this joint venture main contract with Beijing Urban
Construction Group and Shanghai Construction Group of |
|||||||||||||
|
|
||||||||||||||
|
Tung
Chung Station Development Package 3 Superstructure Works at Area 19 (2002-2004) $975,000,000 The works include the construction of a three
level podium for shopping arcade, day nursery, club house, carpark; 9 numbers of transfer plates; an internal road;
an emergency vehicular access (EVA) and three 53 storeys
high residential towers. The works
also include the design and construction for the pre-cast facades which will
be finished with wall, rendering, tiling and windows before delivered to site
giving a better quality of work as well as to improve the environment by
producing less construction waste. |
||||||||||||||
|
CDA Development Phase II
Superstructure Works (2002-2004) $576,000,000 The
construction of 4 blocks of residential towers ranging from 39 to 50 storeys high including indoor swimming pool and children
Club House over a 5-level podium which has already been built by the Phase I
Main Contractor. The Works include also soft and hard landscaping works at
podium roof, fitting-out works for the Community Hall on G/F, and external
works including hard landscaping, road works and paving on G/F of Eastern
podium portion. |
|
|||||||||||||
|
|
||||||||||||||
|
Shenzhen Convention
Exhibition Centre (2002-2005) RMB808,000,000(estimated) The project site area is 220,565 sq m and the total construction floor area is 255,615 sq m. The contract works include the construction of : a two-level basement for E&M equipments; a one-level basement car park; two tunnels; a 60-metre high reinforced concrete main building finished with interior fitting-out and a 126-metre long span steel roof truss. The project will provide 6,000 numbers of international standard booths in exhibition and 6,400 numbers of international standard booths in exhibition and 6,400 numbers of seats in convention part when completed.
|
||||||||||||||